Sometimes cement plant operators want to perform a mill testing and are in need of a temporary heat source. Using the Hotwork International method allows the mill system to be reliably commissioned.
Our special dry out and heat up technology is based on the use of Hotwork International High Velocity Burners operating on an excess air basis, which have been especially developed for the dry out and heat up of all types and sizes of furnaces/kiln/vessels and refractory lined components. The system permits a positive pressure assuring uniform temperatures in the vessel/piping components etc. Our system has been developed to ensure that precise temperature control of hot gas emissions generated by the high velocity burner can be regulated at all stages between 60°C and 1200°C, simultaneously eliminating hot-spots or stagnant areas within the vessel/furnace. The Hotwork International-Technology permits temperature uniformity of ± 3°C.